One-story housing does not suit, and there is no desire and time to mess with papers during the construction of a two-story building. The projects of houses with a basement offered by "Domamo" are waiting for customers all over Russia. Finished works with additional space under the first floor are constantly replenished.

Pros of a house project with a basement

If you properly organize the underground space, then you can get another full-fledged floor, of course, you can’t equip a bedroom in it, but here are other rooms that could not easily fit in the house. But the advantages of the basement do not end there:

  • the basement will be heated, which means that the floor of the first floor will be warm;
  • on the received space it is possible to place residential and technical premises;
  • the total area of ​​\u200b\u200bthe building increases significantly;
  • favorable conditions are created for laying all communications and free access to them;
  • some of the outbuildings that take up space on the site can be moved to the basement.

But having decided to build such a structure, it is necessary to provide for the use of special equipment, since the basement will have to be buried much deeper into the ground, and its excess will need to be removed. The residential basement must remain dry, for which it must be waterproofed.

The basement floor is usually occupied by a boiler room, a workshop, a gym or a billiard room is equipped in it, with a lack of a bathroom, then it. An additional storage room will not hurt anyone, but the garage under the house will be convenient to use, to visit it in bad weather right from home. In the basement, excellent conditions are created for organizing a wine cellar, storing your own and purchased alcoholic products in it.

Choosing a cottage with a basement

Projects of houses with a plinth are ordered by people living on a hill who do not have the opportunity to install a garage and other outbuildings, since their backyard area is small.

But when choosing structures with a basement, there are limitations - they cannot be built in areas where there is seasonal flooding of the soil or groundwater is located close to them. Even with a strong desire, on such plots it will be necessary to invest a lot of material resources and efforts in order to fulfill the drainage system that meets safety requirements.

The cost of the selected project will depend on several criteria:

  • number of storeys;
  • relief of the built-up area;
  • project complexity and required drawings;
  • area of ​​the future home.

There are different project options in the Domamo catalog, if one of them does not quite correspond to the wishes of the customer, then it can be changed by adding or moving walls or ceilings. All adjustments will be reflected in the calculations so that the strength of the entire building is not affected. The same applies to the replacement of materials used.

When choosing projects of one-story houses with a basement for implementation, it is necessary to understand that the cost of their implementation is quite high. Both the basement and the basement significantly increase the estimate for the construction of a private house. Even bad soils on the site lead to serious expenses, since a deep foundation is required. On average, the arrangement of a basement in a cottage of the total construction price is up to 35%. A one-story house with a high base will be truly "golden" if it is built in rocky soil conditions.

Regardless of what type of soil is on the site, the most costly are the work on pouring the floor in the basement, hydro and thermal insulation work. Building a residential building without a basement avoids the above costs.

Layout of one-story houses with a basement: the feasibility of the device

Even despite a significant increase in costs, projects of one-story houses with a basement (photos, drawings, videos, diagrams, sketches are available for viewing on the site) may well justify themselves.

If a one-story house with a basement is designed for a large family on a small plot of land.

  • Poor quality of the soil base.
  • The developer is ready for big expenses.
  • The need to free up additional area above the ground.
  • The developer's great desire is to have a one-story house with a basement.

Project plans for one-story houses with a basement: additions

We understand that not every developer can choose and buy from the catalog of ready-made projects a house plan that suits him in all respects, therefore we offer our clients a number of additional services. The most popular among developers are services that allow standard plans for one-story houses with a basement. Our specialists can also create one-story houses with a basement. An author's project of a new house can be developed, which will best meet the wishes of the client. All options for the company's services can be viewed.

We wish you to find in our richest collection, updated in 2017, the architectural design of your dream home. Have a nice watching!

So, the first issue that can be solved when choosing a house with a basement is the unloading of the upper floors from premises that do not have a direct residential purpose. In fact, you get an additional floor for storing household items, food, tools, communication nodes and other needs. If the groundwater on your site is deep, the basement will cost less than a full one. But with a high level of groundwater, it is irrational to choose house designs with a basement floor, since the construction of such a building will be more expensive.

Another useful function of the basement, perhaps not entirely relevant for our natural conditions. Nevertheless, one should not discount the fact that the presence of such premises gives the owners of the house a sense of security in the event of a natural or man-made disaster. The one who has his own reliable shelter at his disposal feels much calmer, although this criterion is unlikely to become the main one by which you evaluate the projects of houses with a basement.

Important points during construction

Such buildings, of course, have their weaknesses. However, with timely care to reduce them to a minimum, you can eventually get the comfortable, cozy and safe housing that you have always dreamed of. For example, in the basement there is either no natural light at all, or very little light comes in. Considering the projects of houses with a basement, it is very important to check with the architect how this problem is solved.

If you order an individual project, you will have to discuss all these issues with the designer before starting work. In addition, a qualified specialist will necessarily rely on the results of a soil study. Perhaps it is because of these results that the basement will have to be abandoned in favor of a conventional structure. If a company offers you ready-made projects of houses with a basement, not in accordance with the conclusions on your site, it is better to refuse to cooperate with such a company.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TK-visualization, painted. The plinth is lined with decorative stone.
    interior decoration: the decoration was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready Project of his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was precisely such a difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be erected in a short time on the existing foundation. Dmitry and his family had a desire to build a new high-tech house. After careful measurements, a project was made that took into account the old layout, but had a new modern form with interesting innovations! The house has an entrance group where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our lane. To implement such a roof, we called on our knowledge and modern building materials LVL beams, built-up roofing and much more to help. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the country architecture section in high-tech style, in the style chosen by bold Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in their own house in nature there are many opportunities and fresh air. We, in turn, were happy to work on an individual project of a classic red brick house with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement is insulated with 200mm basalt insulation; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, the long work on the project, the construction of the foundation, the construction of the house with the exterior and then the work on the interior! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different finishes, comparing their cost. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become a happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good person! Rumyantsev Andrey came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house ... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "brought to life according to his idea and sketch!"

    House options:

    What was done

    When Customers come to us with bright, modern ideas for a future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in a wooden house, and it was necessary to build a house in a short time, and the frame construction technology became an ideal solution for such tasks! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

    It all started with an individual project found by the Customer's family on a European site. It was with him that she came to our office for the first time. We made preliminary calculations for the project, conducted a tour of the existing construction site, shook hands and the work began to boil! The architect improved and adapted the project to the site and the Customer's family; the foreman "planted" the house on the site. Based on the fact of geological surveys, it was decided to put the house on bored piles. The frame has grown in a few weeks, then the roof, insulation, exterior finish! During the winter, a house grew on the site. The customer invited a third-party technical supervisor who monitored the process regardless of our multi-stage control. The color scheme for painting the imitation of timber was chosen by our manager and here we have a bright and cozy dream country house of the Pushkov family!

One of the most inexpensive ways to expand your house without taking up much space on the site and without violating the norms of number of storeys in suburban development is the arrangement of the space under the house and the creation of a basement floor. This approach makes it possible during the construction to take out all the premises of an auxiliary nature and separate them from the living rooms. Since it is not useful for human health to be at levels below zero (that is, buried underground) for more than four hours a day, it is not worth placing a dining room, living room, or, especially, bedrooms on the basement floor.

Design Features

  • It is necessary to think about sufficient ventilation in order to prevent air from stagnation and humidity to rise, otherwise there will be a danger of fungus on the walls.
  • Since sunlight does not penetrate underground, enhanced artificial lighting will be required, which must be taken into account when calculating the load on the networks at the stage of creating drawings.
  • When constructing a sauna, showers and bathrooms, it will be necessary to install a special pump for sewage, since natural drainage underground is not possible.
  • The height of basements must be at least 2.2 m, which is the norm for both the physical and psychological comfort of residents.
  • In areas with wet soils, the cost of waterproofing will be significantly higher than in sandy or rocky soils.

WITH It should be borne in mind that when arranging in the basement of rooms where people will stay, it is necessary to maintain a temperature of 16 to 22 0 C. In pantries or dressing rooms, heating up to 8 0 C is sufficient.

Use cases

The arrangement of a garage in the basement is a great opportunity to create convenience for all family members at the same time. This is a comfortable parking, and saving space on the site, and the safety of other family members. There are quite a few projects with such a solution in the catalog:

  • original log house on a high stone plinth;
  • three-story with a garage for two cars, making it possible to build on a small plot;
  • compact modern cottage
  • unique, unparalleled

In the basement, home gyms and mini-gyms can be placed:

  • where the “simulator” is adjacent to the sauna and the laundry room, and the technical room separates the cold pantry from them;
  • a cottage with a corner terrace where the size of the basement allows you to plan a spacious billiard room next to the sports area;
  • aristocratic where a staircase hall separates the gym from a large recreation room with a home theater.

A rather reasonable solution is to equip a sauna or a steam room with a relaxation room in the basement, where you can take various wellness treatments at any time of the year. These are projects such as:

  • a cottage with a small attic, where on both sides of the shower there is a steam room and a dry sauna;
  • a representative three-story building, whose underground level accommodated both a sports area, a play area, and a corner where you can listen to music or watch a movie while relaxing after a Finnish bath;
  • quite economical and compact » with a large shower room and Jacuzzi, combined with a steam room in one volume.

In addition, the underground space can be completely utility or designated as a workshop. You can fill it with pantries for various purposes, both heated and cold for food storage and home preservation. When choosing a project, be guided by the needs of your family, and we will be happy to help you with this.